Tulare County, CA

San Joaquin Cross Valley Loop Project

 

QK completed initial biological resource surveys including protocol-level surveys for special-status species, nesting raptors, and other birds, conducted wetlands delineations, and provided that information in reports for the client to use in obtaining project permits from the regulatory agencies (United States Fish and Wildlife Service, California Department of Fish and Wildlife, the United States Army Corps of Engineers and Environmental Protection Agency, and the California Public Utilities Commission). QK conducted follow-up studies to provide the current information as the project progressed, implemented all permit requirements, conducted pre-construction surveys, and performed construction monitoring for the construction of this 23-mile transmission line.

 

Services

 
  • Lorem ipsum
  • Lorem ipsum
  • Lorem ipsum

Markets

 
  • Lorem ipsum
  • Lorem ipsum
  • Lorem ipsum
 
 

Approach

QK worked with the client to achieve a performance schedule that was reasonable and met the needs to the client while allowing sufficient time for the completion of seasonally dependant studies. Follow-up surveys were conducted to provide updated biological information as site conditions changed, project designs were modified, and coordination with the regulatory agencies progressed. A long-term program was established to train construction workers on the implementation of avoidance and minimization measures, train a team of biological compliance monitors, and to implement all mitigation measures.

 

Key Issues

 

The transmission line corridor traversed approximately 11 miles of agriculturally developed land and 12 miles of native foothill grassland habitat that potentially contained a diverse group of threatened, endangered, and protected species. Federal and State permits for the take of species and wetlands were a necessity. Project-specific information on the abundance and distribution of species and wetlands had to be documented at a high degree of specificity and confidence. The high project scrutiny required that the implementation of avoidance and mitigation measures be conducted efficiently, effectively, and with a high degree of documentation.

QK_Results_2x

Results

The transmission line construction project was completed on-time with virtually no major compliance issues, despite a large diversity of biological issues and a complex mitigation and reporting plan.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.