Woodlake & QK Partnership

Woodlake & QK Partnership

The City of Woodlake has grown remarkably over the past decade and is a thriving Central Valley community under the guidance of City Administrator, Ramon Lara. QK has partnered with the City for over 40 years, supporting the community’s vision to be a destination for future families, jobs, and visitors.

Growth by the Numbers:

  • 500+ New homes
  • 150+ New jobs resulting from the industrial park expansion
  • 1.52% Annual population growth (compared to the national average of .9% in similarly sized cities)
  • Significant retail and commercial developments

In partnership with the City, QK has executed numerous successful projects that brought immediate benefits to the community and will continue to do so far into the future. As a trusted consultant, our team works tirelessly to support the City’s aggressive development strategies over the last decade, successfully attracting residential, commercial, and industrial investments. Looking ahead, Woodlake aims to continue this trajectory by delivering ongoing projects including new parks, affordable housing, and recreational facilities. Through continued collaboration and a shared commitment to high standards, the QK/City partnership will undoubtedly continue to enhance the quality of life for Woodlake’s residents for years to come.

Downtown Revitalization: From Struggling Street to Vibrant City Center

One of the greatest testaments to our successful partnership with the City is the revitalization of Woodlake’s downtown area, which needed updated and added infrastructure like streetlighting and safe sidewalks. The downtown now vibrates with a welcoming atmosphere, attractive landscaping features, and an inviting downtown plaza. Along with City, QK was integral in securing the grant funding that made this transformation and other nearby projects possible.

Transportation improvements, including two new roundabouts with two more in design, the Community Center, the Downtown Plaza, a transit center, and numerous parks have made Woodlake an increasingly attractive area for housing developers and families. These projects have not only enhanced the City’s aesthetics but have also fostered a sense of community pride and increased local engagement.

City Engineering Partnership

Over a decade ago, the City of Woodlake chose long-time QKer, Monique Mello, PE, QSD/QSP, as its City Engineer. She has spearheaded numerous projects for the City, and constantly advocated for Woodlake residents. In her own words:

“It’s been an honor to be Woodlake’s City Engineer for over a decade where I get to help the City’s vision come to fruition. All of our projects have added much-needed infrastructure in addition to enhancing the vibrant beauty of the community. I can’t wait to see what the next ten years holds for Woodlake, and I am so grateful to be a part of its success.”

Looking Forward

The City of Woodlake isn’t slowing down. The community continues to introduce new amenities for residents and visitors, including concerts and movies in the park along with other community-focused events. QK continues to help Mr. Lara and City execute its vision by aligning our work with Woodlake’s needs. We carefully allocate our resources to maintain open and strong communication channels with City officials, and we listen to residents and local stakeholders to truly understand community needs. As Woodlake continues to expand its businesses, tax revenue, housing, and jobs, QK will be there every step of the way to ensure that every member of the community has access to the infrastructure and amenities they need to grow and thrive. 

A Thousand Flags

A Thousand Flags

Bakersfield’s annual A Thousand Flags Ceremony is more than just a Memorial Weekend tradition; it’s a profound display of respect and gratitude for the fallen heroes who have served their nation. For the past ten years, QK has played an integral role in this moving tribute, setting the points for flag installation with precision and reverence.

Surveyor Brandon Walker reflects on the firm’s enduring dedication to this meaningful event, stating, “We look forward every year to participate in the placement of the flag locations for this awesome show of respect for our fallen heroes. It has been an honor to participate in this Memorial Weekend tradition for the last ten years.”

Walker’s sentiment encapsulates the profound sense of pride and purpose that drives QK’s involvement in the ceremony. Beyond the technical aspects of their work, QK’s team approaches their role with a deep appreciation for the significance of honoring those who have made the ultimate sacrifice.

As the flags unfurl in the gentle breeze, each one symbolizing a life laid down in service, QK’s contribution stands as a testament to the enduring spirit of remembrance and gratitude. Their meticulous efforts ensure that every flag is placed with care and precision, paying tribute to the courage and sacrifice of the brave men and women who have defended freedom.

As Memorial Weekend approaches each year, the flags serve as a visual reminder of the debt owed to those who have served. And standing among them, QK stands as a beacon of remembrance, ensuring that the sacrifices of our heroes are never forgotten.

A very special recognition to Alan Walker, who has championed this effort every year we have participated. We admire your passion for this cause and are proud to support you and this effort for the past decade!

Castle Rock & Sierra Roundabout

City of Woodlake, CA

Castle Rock & Sierra Roundabout

The City of Woodlake constructed a single-lane roundabout at the Castle Rock Street and Sierra Avenue intersection. As the Woodlake community grew, the original intersection became congested with school, recreation, and residential traffic. This $3.1 million project was paid for by Measure R, CMAQ, and LSRP funds and included the roundabout, curb, gutters, ramps, sidewalks, streetlights, paving, on-street parking, landscaping, irrigation, sewer system, and storm drain improvements. 

The Castle Rock & Sierra Roundabout achieved the City’s objectives to relieve traffic congestion, increase bike/pedestrian safety, and provide adequate ADA accessibility. Added benefits of the project included improved air quality for nearby residents, park users, and elementary school students. Landscaping additions to the corners and center of the roundabout beautified the area for the growing number of residents and travelers who will pass through the intersection in the coming years. The City transformed an inadequate intersection into a roundabout that addressed basic transit needs while creating an aesthetic that reflects the City staff’s dedication to their community. 

Visalia Road Improvements Phase I

City of exeter, CA

Visalia Road Improvements Phase I

 

The Visalia Road Improvement Project Phase I consisted of road improvements between Jacob Place and Orange Avenue. The scope included the total reconstruction of the existing roadway, new curb and gutter, landscaped medians, entrances into businesses, sidewalk, signing and striping, and modifications to the existing signal at Belmont Road.  This $4.3 million was part of the City of Exeter’s sweeping Visalia Road Improvement Project that addresses community safety and operational needs. 

Years of wet winters and hot summers took a toll on the road’s original pavement, making it unpleasant for travel. The road was not fully ADA accessible and wasn’t inviting or conducive to pedestrian traffic, negatively impacting local businesses. The project design addressed each of these areas with added considerations for improving traffic circulation and providing a fresh, inviting thoroughfare through the City. The completed project met local and regional active transportation goals and will increase the economic viability of the area.